Print Page   |   Sign In   |   Register
Southwest Aqueduct Project Tour
Register Tell a Friend About This EventTell a Friend
Southwest Aqueduct Project Tour

Project Tour of the Southwest Aqueduct Reach 1 from the Jordan Narrows Pipeline/Jordan Aqueduct Reach 1 Interconnect Vault (16535 South 1300 West) to the Jordan Valley Water Treatment Plant (15305 South 3200 West). Approximately 12,000 feet of 66-inch diameter welded steel pipe is being installed.

 Export to Your Calendar 4/24/2019
When: Wednesday, April 24th
10:00 am to 2:00 pm
Where: 8215 South 1300 West
West Jordan 84088
United States
Contact: Nicole Baser
801-712-1619 x2


Online registration is available until: 4/20/2019
« Go to Upcoming Event List  

 

 

Project Tour of the Southwest Aqueduct Reach 1 from the Jordan Narrows Pipeline/Jordan Aqueduct Reach 1 Interconnect Vault (16535 South 1300 West) to the Jordan Valley Water Treatment Plant (15305 South 3200 West). Approximately 12,000 feet of 66-inch diameter welded steel pipe is being installed.

Association Management Software Powered by YourMembership  ::  Legal